Bando 13-2010 Metric V-Belts A79 BCW (UL) - THREE-PHASE CAPACITORS BANKS

Regular price $ 15.96
Tax included. Shipping calculated at checkout.
Description

Bando 13-2010 Metric V-Belts A79 BCW (UL) - THREE-PHASE CAPACITORS BANKSBando 13 2010 Continuous improvements in materials, design, and manufacturing methods make the Power King classical cross section belt the workhorse of the industry. Bias cut, rubber impregnated fabric cover provides superior flexibility and friction resistance. Oil and heat resistant. Ultra high strength polyester cords assure fatigue resistance and length stability while providing the flexibility needed to attain long, trouble free service.

36N072T160E7 HP 5 VOLTS 575 AMP 5

Load 87° C Start Configuration DOL Break-Down Torque 51

Standard IEC 60034-1 Frequency 50 Hz Voltage 380-400-415/660-690//460 V Number of poles 6 Degree of Protection IP55 Synchronous speed 1000 rpm Output rating 3 kW Mounting B3T Flange Without Terminal box¹ Top Enclosure IC411 - TEFC

lb Locked rotor torque 200 % Breakdown torque 310 % Locked rotor time 50s (cold) 28s (hot) Moment of inertia (J) 1

59 LOCKED ROTOR TORQUE UOM OZFT INSULATION CLASS B LOCKED ROTOR AMPS 10

EM4115T-5 SPEC

CESSWDNM3610T-5 SPEC

0 a Front Face Code Standard Front Shaft Indicator None Heater Indicator No Heater Insulation Class F Inverter Code Not Inverter KVA Code G Lifting Lugs Standard Lifting Lugs Locked Bearing Indicator No Locked Bearing Motor Lead Exit Ko Box Motor Lead Termination Flying Leads Motor Lead Quantity/Wire Size 12 @ 8 AWG Motor Type 4062M Mounting Arrangement F1 Number of Poles 2 Overall Length 25

35 IN Power Factor 89 Product Family General Purpose Pulley End Bearing Type Ball Pulley Face Code Standard Pulley Shaft Indicator Standard Rodent Screen None RoHS Status ROHS COMPLIANT Service Factor 1

VEM3615T SPEC 36A003Q032G2 HP 5 VOLTS 230/460 AMPS 13

24 VITON 35FH4005A32SP IEC FH NO GRSR W/3 HOLES - PRIMED MN416A01 TAG-INSTAL-MAINT no wire (2100bx)4/22

Power supply 200-240 V Input phases Three-phase Configuration With options Rated current (ND) 70 Rated current (HD) 56 RFI filter Without filter Enclosure NEMA1 Dynamic braking Standard with braking Safety Stop No Electronic supply Internal Attributes

Easy Shipping

Quick Dispatch:

Your Bando 13-2010 Metric V-Belts A79 BCW (UL) - THREE-PHASE CAPACITORS BANKS orders ship within 1-2 business days.

Delivery Options:

  • Standard: 3-7 business days
  • Fast: 2-3 business days
  • Express: 1-2 business days

Order Tracking:

You'll receive a tracking link by email once your Bando 13-2010 Metric V-Belts A79 BCW (UL) - THREE-PHASE CAPACITORS BANKS ships.

Need Help?
Questions about Bando 13-2010 Metric V-Belts A79 BCW (UL) - THREE-PHASE CAPACITORS BANKS, sizing, or delivery? We're just an email away.

Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Bando 13-2010 Metric V-Belts A79 BCW (UL) - THREE-PHASE CAPACITORS BANKS in your area.

Get Shipping Estimates

You may also like

recommand products

{{{showcase_5_name}}}

US$ {{{showcase_5_price}}}

Min. order: 1 piece

{{{showcase_5_star}}} ({{{showcase_5_reviews}}} reviews)

Sold : Login>>

{{{showcase_6_name}}}

US$ {{{showcase_6_price}}}

Min. order: 1 piece

{{{showcase_6_star}}} ({{{showcase_6_reviews}}} reviews)

Sold : Login>>

{{{showcase_7_name}}}

US$ {{{showcase_7_price}}}

Min. order: 1 piece

{{{showcase_7_star}}} ({{{showcase_7_reviews}}} reviews)

Sold : Login>>

{{{showcase_8_name}}}

US$ {{{showcase_8_price}}}

Min. order: 1 piece

{{{showcase_8_star}}} ({{{showcase_8_reviews}}} reviews)

Sold : Login>>

{{{showcase_9_name}}}

US$ {{{showcase_9_price}}}

Min. order: 1 piece

{{{showcase_9_star}}} ({{{showcase_9_reviews}}} reviews)

Sold : Login>>

{{{showcase_10_name}}}

US$ {{{showcase_10_price}}}

Min. order: 1 piece

{{{showcase_10_star}}} ({{{showcase_10_reviews}}} reviews)

Sold : Login>>